6 turbines · operational · Cumbria
| Status | Operational |
|---|---|
| County / region | Cumbria |
| Turbines | 6 |
| Installed capacity | 12 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | The Renewables Infrastructure Group (TRIG) |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 5 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4104.
The application was determined in about 35 months. Construction to first power took about 12 months. The register records a refusal in September 2010 before the scheme progressed. Permission was ultimately granted on appeal in February 2011. A planning permission on this site expired in February 2010. The scheme has been operating for about 13 years. That works out at 2 MW per turbine on average.
See all wind farms in Cumbria.