🌊 Offshore wind farm

Thanet
Offshore

Recorded in WhichWindTurbine: 100 wind turbines in operation. Point the app at one of them to see its profile in real time.

100
turbines
300 MW
MW total
3 MW
per turbine

📍 100 turbines mapped — each dot is a turbine recorded in the database. Average position: 51.43041 N · 1.63215 E.

Thanet

100 turbines · operational · Offshore

Wind farm facts

StatusOperational
County / regionOffshore
Turbines100
Installed capacity300 MW
Turbine capacity3 MW
Tip heightnot recorded
Operator (or applicant)Vattenfall
Turbine manufacturerVestas
Turbine modelV90-3.0
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Vestas · V90-3.0 · 100 turbines · 3 MW each · rotor 90 m

Source: Generate Energy, “Offshore Wind — Opportunities in the East of England” (2025), 2025-05, read on 2026-09-19. Corroborated by 4 further sources. Where OpenStreetMap tags differ, this record prevails.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20332010201520202025today1234
  1. 1Nov 2005 — Application submitted
  2. 2Dec 2006 — Permission granted
  3. 3Nov 2009 — Under construction
  4. 4Sep 2010 — Operational

The register also records a planning permission expiry in Dec 2018, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 5 years.

The register links a second scheme on this site (REPD ref 6299, Application Refused): 34 turbines · 10 MW each · 210 m tip height · applicant Vattenfall. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2499.

What the register tells us

The application was determined in about 13 months. Construction to first power took about 10 months. A planning permission on this site expired in December 2018. The scheme has been operating for about 16 years. That works out at 3 MW per turbine on average.

Nearby

See all wind farms in Offshore.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.