Wharrels Hill Wind Farm
Cumbria

Recorded in WhichWindTurbine: 8 wind turbines in operation. Point the app at one of them to see its profile in real time.

8
turbines
10.4 MW
MW total
1.3 MW
per turbine

📍 8 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.72845 N · 3.28218 W.

Wharrels Hill Wind Farm

8 turbines · operational · Cumbria

Wind farm facts

StatusOperational
County / regionCumbria
Turbines8
Installed capacity10.4 MW
Turbine capacity1.3 MW
Tip heightnot recorded
Operator (or applicant)Wharrels Hill Windfarm Ltd/ National Windpower
Turbine manufacturerNordex (secondary source)
Turbine modelN60 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

Nordex · N60 · 8 turbines · 1.3 MW each

Source: Wikipedia, list of onshore wind farms in England (compiled from RenewableUK's UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203020052010201520202025today1234
  1. 1Dec 2000 — Application submitted
  2. 2Jun 2002 — Permission granted
  3. 3Apr 2007 — Under construction
  4. 4Aug 2007 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 7 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2618.

What the register tells us

The application was determined in about 18 months. Construction to first power took about 4 months. The scheme has been operating for about 19 years. That works out at 1.3 MW per turbine on average.

Nearby

See all wind farms in Cumbria.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.