🌬️ Onshore wind farm

Bryn titli Windfarm
Powys

Recorded in WhichWindTurbine: 22 wind turbines in operation. Point the app at one of them to see its profile in real time.

22
turbines
9.9 MW
MW total
0.45 MW
per turbine

📍 22 turbines mapped — each dot is a turbine recorded in the database. Average position: 52.36421 N · 3.56867 W.

Bryn titli Windfarm

22 turbines · operational · Powys

Wind farm facts

StatusOperational
County / regionPowys
Turbines22
Installed capacity9.9 MW
Turbine capacity0.45 MW
Tip heightnot recorded
Operator (or applicant)Innogy
Turbine manufacturerBonus (now Siemens) (secondary source)
Turbine modelB450 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

Bonus (now Siemens) · B450 · 22 turbines · 0.45 MW each

Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

~2016 reached1995200020052010201520202025today123
  1. 1Mar 1993 — Application submitted
  2. 2Aug 1993 — Permission granted
  3. 3Jun 1994 — Operational

The register also records a planning permission expiry in Aug 2012, after commissioning: an administrative date with no effect on the operating wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 1 year.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3015.

What the register tells us

The application was determined in about 5 months. A planning permission on this site expired in August 2012. The scheme has been operating for about 32 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.45 MW per turbine on average.

Nearby

See all wind farms in Powys.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.