16 turbines · operational · Tayside
| Status | Operational |
|---|---|
| County / region | Tayside |
| Turbines | 16 |
| Installed capacity | 36.8 MW |
| Turbine capacity | 2.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Scottish and Southern Energy (SSE) |
| Turbine manufacturer | Senvion |
| Turbine model | MM92/2050 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 5 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4009.
The application was determined in about 15 months. A planning permission on this site expired in February 2000. The scheme has been operating for about 18 years. That works out at 2.3 MW per turbine on average.