108 turbines · operational · Offshore
| Status | Operational |
|---|---|
| County / region | Offshore |
| Turbines | 108 |
| Installed capacity | 389 MW |
| Turbine capacity | 3.6 MW |
| Tip height | not recorded |
| Operator (or applicant) | Scottish Power Renewables & Orsted (formerly Dong Energy) |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 8 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2519.
The application was determined in about 29 months. Construction to first power took about 17 months. A planning permission on this site expired in September 2000. The scheme has been operating for about 12 years. That works out at 3.6 MW per turbine on average.