🌬️ Onshore wind farm

Dungavel Hill
Strathclyde

Recorded in WhichWindTurbine: 13 wind turbines in operation. Point the app at one of them to see its profile in real time.

13
turbines
29.9 MW
MW total
2.3 MW
per turbine

📍 13 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.60518 N · 4.09721 W.

Dungavel Hill

13 turbines · operational · Strathclyde

Wind farm facts

StatusOperational
County / regionStrathclyde
Turbines13
Installed capacity29.9 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)John Laing Environmental Assets Group
Turbine manufacturerNordex
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20382010201520202025today1234
  1. 1Feb 2006 — Application submitted
  2. 2Dec 2009 — Permission granted
  3. 3May 2014 — Under construction
  4. 4Aug 2015 — Operational

The register also records a planning permission expiry in Dec 2004, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 9 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4362.

What the register tells us

The application was determined in about 46 months. Construction to first power took about 15 months. A planning permission on this site expired in December 2004. The scheme has been operating for about 11 years. That works out at 2.3 MW per turbine on average.

Nearby

See all wind farms in Strathclyde.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.