🌬️ Onshore wind farm

Enoch Hill
Strathclyde

Recorded in WhichWindTurbine: 15 wind turbines in operation. Point the app at one of them to see its profile in real time.

15
turbines
70 MW
MW total
4.6 MW
per turbine
14.99 m
tip height

📍 15 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.33909 N · 4.24572 W.

Enoch Hill

15 turbines · operational · Strathclyde

Wind farm facts

StatusOperational
County / regionStrathclyde
Turbines15
Installed capacity70 MW
Turbine capacity4.6 MW
Tip height14.99 m
Operator (or applicant)E.ON Renewables
Turbine manufacturerNordex
Turbine modelN133/4.8 (13) and N117/3600 Delta4000 (2)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Nordex · N133/4.8 (13) and N117/3600 Delta4000 (2) · 15 turbines · 4.6 MW each

Source: RWE, construction completion press release, 2026-08, read on 2026-09-15. Corroborated by 6 further sources. OpenStreetMap tags shown elsewhere on this page differ from this record; the sources above prevail.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2048201620182020202220242026today12345
  1. 1Sep 2015 — Application submitted
  2. 2Sep 2019 — Permission granted
  3. 3Sep 2019 — Granted on appeal
  4. 4Oct 2023 — Under construction
  5. 5Apr 2026 — Operational

The register also records a planning permission expiry in Sep 2025, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 11 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3502.

What the register tells us

The application was determined in about 48 months. Construction to first power took about 30 months. Permission was ultimately granted on appeal in September 2019. A planning permission on this site expired in September 2025. The scheme has been operating for about 0 year. That works out at 4.67 MW per turbine on average.

Nearby

See all wind farms in Strathclyde.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.