🌬️ Onshore wind farm

Goole Fields
Humberside

Recorded in WhichWindTurbine: 16 wind turbines in operation. Point the app at one of them to see its profile in real time.

16
turbines
32.8 MW
MW total
2.05 MW
per turbine

📍 16 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.66362 N · 0.88351 W.

Goole Fields

16 turbines · operational · Humberside

Wind farm facts

StatusOperational
County / regionHumberside
Turbines16
Installed capacity32.8 MW
Turbine capacity2.05 MW
Tip heightnot recorded
Operator (or applicant)RWE npower
Turbine manufacturerSenvion (secondary source)
Turbine modelMM92 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

Senvion · MM92 · 16 turbines · 2.05 MW each

Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203720052010201520202025today1234
  1. 1Apr 2003 — Application submitted
  2. 2Sep 2003 — Permission granted
  3. 3Mar 2012 — Under construction
  4. 4Aug 2014 — Operational

The register also records a planning permission expiry in Sep 2013, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 11 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4373.

What the register tells us

The application was determined in about 5 months. Construction to first power took about 29 months. A planning permission on this site expired in September 2013. The scheme has been operating for about 12 years. That works out at 2.05 MW per turbine on average.

Nearby

See all wind farms in Humberside.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.