Wind farms in Co. Fermanagh

8 wind farms · 76 turbines

8wind farms
76turbines
150MW recorded

Commissioning years range from 1995 to 2018.

Status: Operating 8

Turbine manufacturers: Vestas (2) · GE (2) · Nordex (1) · Siemens Gamesa (1) — recorded for 6 of 8 wind farms

The largest is Slieve Rushen Extension with 18 turbines and 54 MW. It is followed by Tappaghan (13 turbines) and Callagheen (13 turbines).

6 of the 8 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.

On average, a wind farm in this region has 9.5 turbines, for 18.8 MW.

0 of these wind farms have a detailed page; the others are listed here from the public registers.

Wind farmTurbinesCapacityYearManufacturer
Slieve Rushen Extension1854 MW2008Vestas
Tappaghan1319.5 MW2005Nordex
Callagheen1322.8 MW2005Siemens Gamesa
Slieve Rushen Phase 1 Wind Farm105 MW1995Vestas
Tappaghan Extension69 MW2009not recorded
Ora More613.8 MW2017GE
Molly Mountain515 MW2014GE
Teiges511 MW2018not recorded