Recorded in WhichWindTurbine: 13 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 6 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.60564 N · 7.72408 W.
13 turbines · operational · Co. Fermanagh
| Status | Operational |
|---|---|
| County / region | Co. Fermanagh |
| Turbines | 13 |
| Installed capacity | 19.5 MW |
| Turbine capacity | 1.5 MW |
| Tip height | not recorded |
| Operator (or applicant) | Greencoat UK Wind |
| Turbine manufacturer | GE Wind Energy (secondary source) |
| Turbine model | 1.5s (secondary source) |
GE Wind Energy · 1.5s · 6 turbines · 1.5 MW each
Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 3 years.
The register links a second scheme on this site (REPD ref 4688, Operational): 6 turbines · 1.5 MW each · applicant Greencoat UK Wind. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3130.
The application was determined in about 15 months. The scheme has been operating for about 21 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 1.5 MW per turbine on average.
See all wind farms in Co. Fermanagh.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.