23 wind farms · 390 turbines
Commissioning years range from 2000 to 2021.
Status: Operating 22 · Under construction 1
Turbine manufacturers: Siemens Gamesa (5) · Vestas (3) · Senvion (1) — recorded for 9 of 23 wind farms
The largest is Crystal Rig Wind Farm Phase 2a with 60 turbines and 138 MW. It is followed by Fallago Rig (48 turbines) and Dun Law Extension (35 turbines).
14 of the 22 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.
On average, a wind farm in this region has 17.0 turbines, for 34.8 MW.
3 of these wind farms have a detailed page; the others are listed here from the public registers.
| Wind farm | Turbines | Capacity | Year | Manufacturer |
|---|---|---|---|---|
| Crystal Rig Wind Farm Phase 2a | 60 | 138 MW | 2010 | Siemens Gamesa |
| Fallago Rig | 48 | 144 MW | 2013 | not recorded |
| Dun Law Extension | 35 | 29.8 MW | 2009 | Vestas |
| Dun Law | 26 | 17.2 MW | 2000 | Vestas |
| Bowbeat Emly Bank / Rough Side | 24 | 31.2 MW | 2002 | not recorded |
| Black Hill (Borders) | 22 | 28.6 MW | 2007 | not recorded |
| Drone Hill | 22 | 28.6 MW | 2012 | Vestas |
| Longpark | 19 | 38 MW | 2009 | Senvion |
| Aikengall IIa Community Wind Farm | 19 | 81.7 MW | 2021 | not recorded |
| Crystal Rig Phase 1 | 16 | 40 MW | 2004 | Siemens Gamesa |
| Penmanshiel Wind Farm | 14 | 28 MW | 2016 | not recorded |
| Quixwood Moor | 13 | 29.9 MW | 2017 | not recorded |
| Toddleburn | 12 | 27.6 MW | 2010 | not recorded |
| Crystal Rig Wind Farm Phase IV | 11 | 44 MW | n/a | Siemens Gamesa |
| Glenkerie Wind Farm | 11 | 22 MW | 2012 | not recorded |
| Langhope Rig | 10 | 16 MW | 2015 | not recorded |
| Crystal Rig Extension II | 9 | 20.7 MW | 2010 | Siemens Gamesa |
| Crystal Rig Wind Farm Phase III | 6 | 13.8 MW | 2016 | Siemens Gamesa |
| Carcant Windfarm | 3 | 6 MW | 2010 | not recorded |
| Brockholes Wind Cluster | 3 | 2.4 MW | 2013 | not recorded |
| Hoprigshiels Community Wind Farm | 3 | 6.9 MW | 2017 | not recorded |
| Moorhouse Farm | 2 | 1 MW | 2018 | not recorded |
| Kinegar Quarry | 2 | 5 MW | 2017 | not recorded |