54 wind farms · 3389 turbines
Commissioning years range from 2003 to 2025.
Status: Operating 48 · Under construction 6
Turbine manufacturers: Siemens Gamesa (25) · Vestas (12) · GE (2) — recorded for 39 of 54 wind farms
The largest is Dogger Bank A & B (was Creyke Beck A & B) with 175 turbines and 2275 MW. It is followed by London Array Phase 1 (175 turbines) and Hornsea 1 - Heron & Njord (174 turbines).
24 of the 48 wind farms with a recorded commissioning year were built before 2015, which makes them candidates for repowering in the coming years.
On average, a wind farm in this region has 62.8 turbines, for 423.4 MW.
0 of these wind farms have a detailed page; the others are listed here from the public registers.
| Wind farm | Turbines | Capacity | Year | Manufacturer |
|---|---|---|---|---|
| Dogger Bank A & B (was Creyke Beck A & B) | 175 | 2275 MW | n/a | GE |
| London Array Phase 1 | 175 | 630 MW | 2013 | Siemens Gamesa |
| Hornsea 1 - Heron & Njord | 174 | 1218 MW | 2019 | not recorded |
| Hornsea 2 - Optimus and Breesea | 165 | 1320 MW | 2022 | Siemens Gamesa |
| Gwynt y Mor | 160 | 576 MW | 2015 | not recorded |
| Greater Gabbard Wind Farm | 140 | 504 MW | 2012 | Siemens Gamesa |
| Rampion Offshore Wind Farm (Hastings Zone) | 116 | 400.2 MW | 2017 | not recorded |
| Seagreen | 114 | 1048.8 MW | 2023 | Vestas |
| West of Duddon Sands | 108 | 388.8 MW | 2014 | not recorded |
| East Anglia 1 (EA 1) | 102 | 714 MW | 2020 | Siemens Gamesa |
| Moray East | 100 | 950 MW | 2022 | Vestas |
| Sofia (Teesside B) | 100 | 1415.1 MW | n/a | GE |
| Thanet | 100 | 300 MW | 2010 | Vestas |
| Walney 3 | 93 | 558 MW | 2018 | Siemens Gamesa |
| Triton Knoll | 90 | 855 MW | 2022 | Vestas |
| Sheringham Shoal | 88 | 316.8 MW | 2012 | Siemens Gamesa |
| Dogger Bank C (was Teesside A) | 87 | 1218 MW | n/a | Siemens Gamesa |
| Beatrice | 84 | 588 MW | 2019 | Siemens Gamesa |
| Centrica (Lincs) | 75 | 270 MW | 2013 | Siemens Gamesa |
| Humber Gateway A | 73 | 219 MW | 2015 | Vestas |
| Inch Cape | 72 | 1080 MW | n/a | Vestas |
| Dudgeon East | 67 | 402 MW | 2017 | Siemens Gamesa |
| The East Anglia Array - Norfolk Boreas | 67 | 1005 MW | n/a | Vestas |
| Moray West Offshore Wind Farm Project | 60 | 882 MW | 2025 | Siemens Gamesa |
| Galloper Wind Farm | 56 | 352.8 MW | 2018 | Siemens Gamesa |
| Neart na Gaoithe | 54 | 432 MW | 2025 | Siemens Gamesa |
| Walney 1 | 51 | 183.6 MW | 2011 | Siemens Gamesa |
| Walney 2 | 51 | 183.6 MW | 2012 | Siemens Gamesa |
| Race Bank (Phase 1) | 46 | 289.8 MW | 2017 | Siemens Gamesa |
| Race Bank (Phase 2) | 45 | 283.5 MW | 2018 | Siemens Gamesa |
| Westermost Rough A | 35 | 210 MW | 2015 | Siemens Gamesa |
| Burbo Bank Extension (Burbo Bank 2) | 32 | 256 MW | 2017 | not recorded |
| Robin Rigg West | 30 | 90 MW | 2009 | not recorded |
| Barrow | 30 | 90 MW | 2006 | not recorded |
| Ormonde Offshore | 30 | 150 MW | 2012 | not recorded |
| Scroby Sands | 30 | 60 MW | 2004 | not recorded |
| North Hoyle | 30 | 60 MW | 2003 | Vestas |
| Kentish Flats | 30 | 90 MW | 2005 | Vestas |
| Gunfleet Sands Offshore Wind Scheme | 30 | 108 MW | 2009 | Siemens Gamesa |
| Robin Rigg East | 28 | 84 MW | 2010 | not recorded |
| Teeside Offshore Wind Farm | 27 | 62.1 MW | 2013 | Siemens Gamesa |
| Inner Dowsing | 27 | 97.2 MW | 2008 | Siemens Gamesa |
| Lynn | 27 | 97.2 MW | 2008 | Siemens Gamesa |
| Burbo Bank | 25 | 90 MW | 2007 | not recorded |
| Rhyl Flats | 25 | 90 MW | 2009 | not recorded |
| Gunfleet Sands II | 18 | 64.8 MW | 2009 | Siemens Gamesa |
| Kentish Flats 2 | 15 | 49.5 MW | 2015 | Vestas |
| European Offshore Wind Deployment Centre (EOWDC) (Aberde | 11 | 96.8 MW | 2018 | Vestas |
| Kincardine Offshore Windfarm | 6 | 57 MW | 2021 | Vestas |
| Blyth Offshore Wind Test Site | 5 | 41.5 MW | 2017 | not recorded |
| Hywind Scotland Pilot Park (Hywind 2) Demonstrator | 5 | 30 MW | 2017 | Siemens Gamesa |
| Dounreay Trì Floating Wind Demonstration | 2 | 10 MW | n/a | not recorded |
| Gunfleet Sands - (Demo) Extension | 2 | 12 MW | 2013 | Siemens Gamesa |
| Levenmouth demonstration turbine (Fife Energy Park) | 1 | 6 MW | 2014 | not recorded |